Room 08 of 15 Partly built

Operations Floor

Operations turn inputs into outputs. The room is laid out as a production system: design the process, run it and keep it supplied, with a working tool for each question and one fictional business, Wrenhurst Cycles, running through most of them. The room's first interactions, on Atelier Barro's studio and Marigold Kitchens' restaurants, are here too. Break-even (5.5) is worked on the Finance Desk.

Section 01: The production system, stage by stage

Design the process, run it, and keep it supplied. Each question has a working tool with your own figures, a fictional worked example and its syllabus status.

  1. Stage 1

    Design the process

    How and where to produce, before anything is made.

  2. Stage 2

    Run the process

    Using the capacity well, and getting the output right first time.

  3. Stage 3

    Feed the process

    Keeping materials arriving: when to reorder, how much, and where supply can fail.

Section 02: One business through the floor

Wrenhurst Cycles, the fictional bicycle maker of the notes on production planning, runs through most of the tools, so their figures connect.

  • 250 bikes a week: the capacity of the assembly line, which builds about 200
  • 200 gear sets used a week, reordered 800 at a time when stock falls to 600
  • 8 weeks by sea for every frame, from a single partner factory overseas

Section 03: Case work

The room's first three interactions, each built on a fictional case: a location in Mumbai for Marigold Kitchens, and the kiln and the clay at Atelier Barro.

Section 04: Choosing a location

Subtopic 5.4, AO2. Weigh the factors yourself, and see how much the answer depends on the weights.

Interaction

Where should the first Mumbai restaurant go?

Source: Simulated data

Weighted scoring turns a location decision into numbers you can argue about. The scores are given; the weights are yours.

If Meera chooses organic growth, the first of the four Mumbai restaurants needs a site. Farah Sheikh, the finance manager, has visited three and scored each factor from 1 (poor) to 10 (excellent).

  • Site A A ground-floor unit on a busy street in an office district. Rent ₹6.6m a year. Full at weekday lunchtimes, with many restaurants nearby.
  • Site B A narrow unit beside a suburban railway station, with a small kitchen. Rent ₹5.4m a year. Heavy footfall at commuting hours.
  • Site C A residential neighbourhood beside a produce market. Rent ₹4.2m a year. Families nearby in the evening, but few offices, so lunchtimes would be thin.
How much does each factor matter? 0 to 5
  1. 4
    A higher score means lower costs.
  2. 5
  3. 3
    The recipes depend on fresh, local produce.
  4. 2
    Training a cook to Marigold's standard takes about four months.
  5. 2
  6. 3

Scores out of 10 for each factor and site, with the weight of each factor
Factor Weight Site ASite BSite C
Rent and running costs 4 3 (low) 6 8
Customers nearby at lunch and dinner 5 9 7 3 (low)
Access to fresh produce and suppliers 3 5 5 7
Cooks available to recruit 2 6 5 7
Little direct competition nearby 2 3 (low) 6 7
Fit with a home-style brand 3 7 3 (low) 7

Weighted ranking

Each site's weighted total: the sum of weight times score
Site Rank Total % of maximum Bar
Site C111761.6%
Site A211158.4%
Site B310555.3%

Reading. Site C ranks first with 117 points, 6 ahead of Site A. The ranking is sensitive to the weights: at a weight of 2 on rent and running costs (now 4), Site A ranks first; at a weight of 0 on access to fresh produce and suppliers (now 3), Site A and Site C tie; at a weight of 0 on little direct competition nearby (now 2), Site A ranks first; at a weight of 0 on fit with a home-style brand (now 3), Site B and Site C tie.

Implication. A close ranking means the decision rests on the weights, which are judgements about priorities. Agree the weights before seeing the totals, and check the qualitative factors the scores leave out.

Scores of 3 or below: check whether any rules a site out

  • Site A: rent and running costs, 3 out of 10
  • Site A: little direct competition nearby, 3 out of 10
  • Site B: fit with a home-style brand, 3 out of 10
  • Site C: customers nearby at lunch and dinner, 3 out of 10
How the totals are worked out

Each site's total is the sum, over the factors, of the factor's weight times the site's score. With the suggested weights, Site C scores 4 × 8 + 5 × 3 + 3 × 7 + 2 × 7 + 2 × 7 + 3 × 7 = 117. The most a site could score is the sum of the weights times 10, which is 190. Weighted scoring is a decision-making method, not one of the guide's toolkit tools or formulas.

Saved on this device only.

Show content for

Showing everything. HL-only material is marked HL.

Section 05: Capacity utilization and productivity

Subtopic 5.6, HL only, AO2 and AO4.

Interaction

How hard is the kiln working?

Source: Simulated data HL only

Atelier Barro's kiln can fire 1,200 mugs a month. Compare a quiet October with a November that includes the hotel's order, and see what happens to each measure.

Choose a month

October, actual: A normal month, before the new electricity tariff.

Showing October, actual. With JavaScript on, you can change month and edit the figures.

Inputs
Reclaimed as clay, never fired.
All the costs of the month, fixed and variable.

Results

Capacity utilization
53.3%640 of 1,200 mugs
Defect rate
5.88%40 of 680 mugs failed inspection
Labour productivity
2.00good mugs a labour hour
Productivity rate
113.0%output value ÷ input cost × 100
Fixed cost carried by each mug
€12.59€8,060 ÷ 640 mugs
  • Used: 640 mugs
  • Spare: 560 mugs
  • From 85%: little room for a rush order or a breakdown

Reading. The studio is using 53.3% of its capacity, with 560 mugs of spare capacity. Each mug carries €12.59 of fixed costs.

Implication. Much of the capacity stands idle, so fixed costs are spread over few units. More sales, or selling the spare capacity, would lower the cost of each unit; cutting capacity would save cost but limit growth.

The bands used in the reading (below 60%, 60 to 85%, 85 to 97%, 97% and above) are the platform's rule of thumb, not an IB rule.

The working: capacity utilization rate

Given
  • Actual output this month: 640 mugs
  • Productive capacity: 1,200 mugs
Formula
Capacity utilization rate = actual output ÷ productive capacity × 100
Substitution
= 640 ÷ 1,200 × 100
Working
640 ÷ 1,200 = 0.5333
0.5333 × 100 = 53.33%
Answer
53.3%

The guide gives this formula (p. 65).

Unit
per cent of capacity
Interpretation
The studio is using 53.3% of its capacity, with 560 mugs of spare capacity. Each mug carries €12.59 of fixed costs.
Business implication
Much of the capacity stands idle, so fixed costs are spread over few units. More sales, or selling the spare capacity, would lower the cost of each unit; cutting capacity would save cost but limit growth.
The working: productivity rate
Given
  • Total output, valued at its selling price: €14,080
  • Total input, valued at its cost: €12,463.20
Formula
Productivity rate = total output ÷ total input × 100
Substitution
= €14,080 ÷ €12,463.20 × 100
Working
14,080 ÷ 12,463.20 = 1.1297
1.1297 × 100 = 112.97%
Answer
113.0%

The guide gives this formula (p. 65) without units. Output and input are valued in the same currency here so that the result is a percentage.

Unit
per cent: output value for each 100 of input value
Interpretation
Every €100 of inputs produced €112.97 of output, valued at selling prices.
Business implication
Compare periods, not single figures: the rate rises when fixed inputs, such as the studio and the kiln, are spread over more output.
The working: defect rate
Given
  • Mugs that failed inspection: 40
  • Mugs made: 680
Formula
Defect rate = units that fail to meet the quality standard ÷ units made × 100
Substitution
= 40 ÷ 680 × 100
Working
40 ÷ 680 = 0.0588
0.0588 × 100 = 5.88%
Answer
5.88%

A standard definition. The guide's formula list does not include it; the teacher support material's glossary describes the defect rate as a percentage (TSM, p. 83).

Unit
per cent of mugs made
Interpretation
5.9% of the mugs made never reach a customer.
Business implication
A lower defect rate raises good output without more hours or more material, and it is usually cheaper to prevent a defect than to find it.
The working: labour productivity
Given
  • Good mugs produced: 640
  • Labour hours worked: 320
Formula
Labour productivity = output ÷ labour input
Substitution
= 640 ÷ 320
Working
640 ÷ 320 = 2.000
Answer
2.00 mugs an hour

A standard definition. The guide's formula list does not include it. Labour input can also be measured in workers rather than hours.

Unit
good mugs a labour hour
Interpretation
Each labour hour produced 2.00 good mugs.
Business implication
Long hours in a busy month can hold output up even if each hour produces less; compare this figure across months before drawing a conclusion.

Section 06: Stock control

Subtopic 5.6, HL only, AO2 and AO4.

Interaction

When should the studio order more clay?

Source: Simulated data HL only

A stock control chart shows when to reorder, how much to keep in reserve and what happens when usage or a delivery does not go to plan.

In stock stoneware clay, in 25 kg bags.

The plan
Run a scenario

The plan as entered, with usage and lead time exactly as expected.

Results

Reorder level
10 bags4 + 3 × 2
Maximum stock
16 bags4 + 12
Weeks an order lasts
4reorder quantity ÷ usage a week
Lowest stock
4 bagsnever below the buffer

Reading. At 3 bags a week, the studio reorders when stock falls to 10 bags (buffer 4 bags plus 6 bags used during the 2-week lead time). Stock peaks at 16 bags and each order lasts about 4 weeks.

Implication. When usage and lead time are as planned, each delivery arrives just as stock reaches the buffer, so the buffer is never touched.

Stock control chartStock over 16 weeks, starting at the maximum of 16 bags. Orders are placed at the reorder level of 10 bags and arrive after 2.0 weeks. The buffer is 4 bags. The lowest stock is 4 bags.051015200246810121416WeeksStock (bags)Maximum stock 16Reorder level 10Buffer stock 4Lead time 2 weeksDelivery: reorder quantity 12
Chart Stock week by week (black). Orders are placed at the reorder level (dashed blue) and arrive after the lead time; the green line is the buffer, and the shaded band below it is the buffer in use. In a scenario, the planned line is shown dotted. Simulated teaching data.
The chart's figures as a table
Week Stock at the start Used Delivered Stock at the end Note
116313
213310Order placed
31037
4731216
516313
613310Order placed
71037
8731216
916313
1013310Order placed
111037
12731216
1316313
1413310Order placed
151037
16731216

Check your understanding

  1. Answer

    10 bags: buffer 4 + 3 a week × 2 weeks.

  2. Answer

    16 bags: buffer 4 + reorder quantity 12.

  3. 3. The November rush. The hotel order and the busy season raise clay use to 4 bags a week in weeks 5 to 8. With the plan above, how much of the buffer stock is used?

    Answer

    Some of it, but not all. The lowest point is 2 bags.

HL Capacity utilization, productivity and stock control are HL-only material, hidden while you are viewing SL content. Switch to HL above to see them.

Section 07: Unit 5, subtopic by subtopic

Operations management in the guide's order: what the platform has for each subtopic, and the tools that serve it.

  1. 5.1

    Introduction to operations management

    Full notes, mindmap, terms and diagrams

    No tool yet: start with the subtopic page.

  2. 5.2

    Operations methods

    Full notes, mindmap, terms and diagrams

  3. 5.3

    Lean production and quality management HL only

    Full notes, mindmap, terms and diagrams

    No tool yet: start with the subtopic page.

  4. 5.4

    Location

    Full notes, mindmap, terms and diagrams

  5. 5.5

    Break-even analysis

    Full notes, mindmap, terms and diagrams

  6. 5.6

    Production planning HL only

    Full notes, mindmap, terms and diagrams

  7. 5.7

    Crisis management and contingency planning HL only

    Full notes, mindmap, terms and diagrams

    No tool yet: start with the subtopic page.

  8. 5.8

    Research and development HL only

    Full notes, mindmap, terms and diagrams

    No tool yet: start with the subtopic page.

  9. 5.9

    Management information systems HL only

    Full notes, mindmap, terms and diagrams

    No tool yet: start with the subtopic page.

Decision Rooms where operations choices meet costs, prices and growth.

Section 09: Planned for this room

Not built yet, so not linked.

  • A supply chain mapper, with stages, lead times, risks and the critical weaknesses highlighted
  • A quality management simulation comparing quality control with quality assurance
  • Tools for crisis management and contingency planning (5.7, HL), research and development (5.8, HL) and management information systems (5.9, HL)