Production planning
Supply chains, just-in-time against just-in-case, stock control charts, capacity, quality and productivity measures, operating leverage, and the choice between making and buying.
Drag to move the map, or use the arrow keys. Click a branch to fold it away. Whole map shows all of it; zoom with the buttons, or with Ctrl and the scroll wheel.
- Core ideas
- Evaluation
- Tools
- Calculations
- Advantage
- Limitation
- HL HL only
The map as an outline
Supply chain HL
Core ideas
- Definition From raw materials to the final customer
- Local: easier to control Shorter lead times and easier ethical checks, often at a higher cost.
- Global: cheaper but riskier Exposed to transport, political and currency risks.
- Managing suppliers, terms and ethics One weak link can stop production or harm the brand.
JIT versus JIC HL
Evaluation
- Definition JIT: stock arrives as needed
- Advantage Less cash and space tied up
- Limitation No cover if supply fails
- Definition JIC: stock held as insurance
- Advantage Keeps production going
- Limitation Storage, cash and spoilage
- Choice depends on suppliers Reliable suppliers and steady demand favour JIT.
Stock control chart HL
Tools
- Definition Stock over time: a saw-tooth
- Lead time: order to delivery
- Buffer stock: safety level
- Formula Reorder level: when to order Reorder level = buffer stock + (usage per period × lead time in periods)
- Reorder quantity: how much
- Formula Maximum stock level Maximum stock level = buffer stock + reorder quantity
- Risk of a stock-out If a delivery is late or stock is used faster than planned.
Capacity HL
Calculations
- Formula Capacity utilization rate Capacity utilization rate = (actual output ÷ productive capacity) × 100 In the guide's formula list.
- Capacity: maximum output now
- Advantage High rate: lower unit costs Fixed costs are spread over more units.
- Limitation Near 100%, no room for breakdowns
- Low rate: spare capacity
- Boost demand or sell capacity
- Rationalize: cut capacity
Quality and productivity HL
Calculations
- Formula Defect rate Defect rate = (units that fail to meet the quality standard ÷ units made) × 100 Not in the guide's formula list; the standard form.
- Formula Productivity rate Productivity rate = (total output ÷ total input) × 100 In the guide's formula list.
- Formula Labour productivity Labour productivity = total output ÷ number of workers (or labour hours)
- Formula Capital productivity Capital productivity = total output ÷ capital input (such as machine hours)
Operating leverage HL
Core ideas
- Definition How far costs are fixed
- High: capital-intensive Profit swings sharply with sales, so risk is higher when sales fall.
- Low: labour-intensive More costs are variable, so profit is steadier.
- Formula A common measure Degree of operating leverage = total contribution ÷ operating profit The guide gives no formula for operating leverage.
Make or buy HL
Calculations
- Formula Cost to buy (CTB) Cost to buy = supplier price per unit × quantity
- Formula Cost to make (CTM) Cost to make = total fixed costs + (variable cost per unit × quantity)
- On cost: pick the cheaper
- Weigh quality and ethics too Spare capacity, supplier reliability and keeping skills in-house all matter.
- Compare with a decision tree A toolkit method for setting out both choices and their outcomes.
Section 01: Key terms
Each opens its glossary entry: definition, context, example and related terms.
- Buffer stock HL
- Capacity utilization rate HL
- Capital productivity HL
- Capital-intensive production
- Cost to buy (CTB) HL
- Cost to make (CTM) HL
- Defect rate HL
- Just-in-case (JIC) HL
- Just-in-time (JIT) HL
- Labour productivity HL
- Labour-intensive production
- Lead time HL
- Maximum stock level HL
- Operating leverage HL
- Outsourcing
- Productive capacity HL
- Productivity rate HL
- Rationalization HL
- Reorder level HL
- Reorder quantity HL
- Spare capacity HL
- Stock control chart HL
- Stock-out HL
- Supply chain HL
Section 02: Connections
Where this part of the course meets the rest.
- 5.3 Lean production and quality management JIT as a lean method; quality and defects
- 5.4 Location Outsourcing and offshoring reshape the supply chain
- 5.5 Break-even analysis Capacity limits break-even and target output
- 3.3 Costs and revenues Fixed and variable costs behind CTM and leverage
- 3.6 Efficiency ratio analysis Stock turnover measures how fast stock moves