Measure or calculation HL only
Reorder level
Also called re-order level
Where you meet this term: IB Diploma
The level of stock at which a new order is placed, set so that the delivery arrives before stock falls below the buffer level.
In plain words
The stock level at which the next order is placed, so that the delivery arrives before stock falls too low.
In more depth
Reorder level = buffer stock + (usage per period × lead time in periods), a standard form the guide's formula list does not include. It rises with a longer lead time or faster usage; on a stock control chart it is the level at which each order is placed.
Formula
Reorder level = buffer stock + (usage per period × lead time in periods)
In context
It depends on the buffer stock, the rate at which stock is used and the lead time: a longer lead time or faster usage means a higher reorder level. It is easily confused with the reorder quantity, which is how much is ordered, not when. The guide's formula list does not include it; software often places the order automatically when stock reaches this level.
Example
A pharmacy sells 30 boxes of a cold remedy a week, keeps 15 as buffer stock and waits two weeks for delivery, so it reorders when stock falls to 75 boxes.
Common misconceptions
- Misconception
The reorder level is how much stock is ordered each time.
In factThat is the reorder quantity; the reorder level is the point at which to order.
Related terms
Suggested next
- Maximum stock level Linked through Reorder quantity and Stock control chart
- Supply chain Linked through Lead time
- Capacity utilization rate Also in 5.6
- Capital productivity Also in 5.6
- Cost to buy (CTB) Also in 5.6
- Cost to make (CTM) Also in 5.6