Measure or calculation HL only

Reorder level

Also called re-order level

Where you meet this term: IB Diploma

The level of stock at which a new order is placed, set so that the delivery arrives before stock falls below the buffer level.

In plain words

The stock level at which the next order is placed, so that the delivery arrives before stock falls too low.

In more depth

Reorder level = buffer stock + (usage per period × lead time in periods), a standard form the guide's formula list does not include. It rises with a longer lead time or faster usage; on a stock control chart it is the level at which each order is placed.

Formula

Reorder level = buffer stock + (usage per period × lead time in periods)

Work it out in the stock control simulator

In context

It depends on the buffer stock, the rate at which stock is used and the lead time: a longer lead time or faster usage means a higher reorder level. It is easily confused with the reorder quantity, which is how much is ordered, not when. The guide's formula list does not include it; software often places the order automatically when stock reaches this level.

Example

A pharmacy sells 30 boxes of a cold remedy a week, keeps 15 as buffer stock and waits two weeks for delivery, so it reorders when stock falls to 75 boxes.

Common misconceptions

  • Misconception

    The reorder level is how much stock is ordered each time.

    In fact

    That is the reorder quantity; the reorder level is the point at which to order.

Suggested next