Capacity utilization rate
Also called capacity utilization
Where you meet this term: IB Diploma
A business's actual output in a period as a percentage of its productive capacity, the most it could produce with its existing resources.
In plain words
How much of what a business could produce it is actually producing, as a percentage.
In more depth
Capacity utilization rate = (actual output ÷ productive capacity) × 100, as on the guide's formula sheet. A high rate spreads fixed costs over more units and lowers the cost of each, but close to 100% there is no slack for maintenance, breakdowns or a rush order; a low rate means idle resources and a high fixed cost per unit.
Formula
Capacity utilization rate = (actual output ÷ productive capacity) × 100
Work it out in the capacity utilization and productivity calculator
In context
A high rate spreads fixed costs over more units and lowers cost per unit, but close to 100% there is no room for maintenance, breakdowns or a rush order, and staff may be overstretched. A low rate means idle resources and a high fixed cost per unit; the business can try to raise demand, take on work for others or cut capacity. This formula is in the guide's formula list.
Example
A bottling plant that can fill 50,000 bottles a week but fills 40,000 is running at a capacity utilization rate of 80%.
Common misconceptions
- Misconception
A business should always aim for 100% capacity utilization.
In factRunning flat out leaves no time for maintenance and no room for an extra order, and can overstretch staff, so many businesses aim for a high rate below full capacity.
Related terms
Suggested next
- Defect rate Also in 5.6
- Labour productivity Linked through Productivity rate
- Outsourcing Linked through Productive capacity
- Average rate of return (ARR) A related name
- Absence rate Beyond IB A related name
- Churn rate Beyond IB A related name