Measure or calculation HL only

Productivity rate

Also called productivity

Where you meet this term: IB Diploma

A measure of how much output a business gets from the inputs it uses, expressed as total output as a percentage of total input.

In plain words

How much output a business gets from its inputs, as a percentage.

In more depth

Productivity rate = (total output ÷ total input) × 100, as on the guide's formula sheet. Output and input must be measured in comparable units, often money, and the figure is most useful compared over time or with rivals. Raising it lowers the cost of each unit, provided quality holds.

Formula

Productivity rate = (total output ÷ total input) × 100

Work it out in the capacity utilization and productivity calculator

In context

Productivity rises when more is produced from the same inputs, or the same output from fewer, which lowers cost per unit. Output and input must be measured so that the comparison makes sense, often both in money, and the figure is most useful compared over time or with rivals. Labour productivity and capital productivity each look at one input. This formula is in the guide's formula list.

Example

A print shop that turns $40,000 of inputs into $52,000 of output in a month has a productivity rate of 130%.

In management, and in the IB course

General usage

Productivity usually means output per unit of one input, such as output per worker or per hour, and is rarely given as a percentage.

In the IB course

The guide's productivity rate compares total output with total input and multiplies by 100, so the answer is a percentage.

Common misconceptions

  • Misconception

    Higher productivity means people are working longer hours.

    In fact

    Productivity is output per unit of input; longer hours add to input as well as output, while better methods, equipment, training and motivation raise the output from the same input.