Measure or calculation HL only
Maximum stock level
Also called maximum stock
Where you meet this term: IB Diploma
The highest level that stock is planned to reach, just after a delivery arrives.
In plain words
The most stock a business plans to hold, reached just after a delivery arrives.
In more depth
Maximum stock level = buffer stock + reorder quantity, when each delivery arrives just as stock reaches the buffer level. It is limited by storage space, the shelf life of the stock and the cash a business is willing to tie up in it.
Formula
Maximum stock level = buffer stock + reorder quantity
In context
It is limited by storage space, the shelf life of the stock and the cash a business is willing to tie up. On a stock control chart it is the top of each tooth. The formula, which is not in the guide's formula list, holds when each delivery arrives exactly as stock reaches the buffer level.
Example
A florist keeps a buffer of 50 roses and orders 300 at a time, so its stock should peak at 350 roses.
Common misconceptions
- Misconception
A higher maximum stock level is always safer.
In factMore stock protects against running out, but it ties up cash and space and risks waste, damage and goods going out of date.
Related terms
Suggested next
- Reorder level Linked through Reorder quantity and Buffer stock and Stock control chart
- Just-in-case (JIC) Linked through Buffer stock
- Lead time Linked through Stock control chart
- Stock-out Linked through Buffer stock
- Stock turnover A related name
- Capacity utilization rate Also in 5.6