Measure or calculation HL only
Cost to make (CTM)
Also called CTM
Where you meet this term: IB Diploma
The total cost of producing a product or component in-house for the quantity needed, made up of the fixed costs and the variable costs of production.
In plain words
What it would cost a business to produce a product or a part itself.
In more depth
Cost to make = total fixed costs + (variable cost per unit × quantity), where the fixed costs are those of making the item, such as the tooling it needs. If the cost to make is below the cost to buy, making is the cheaper option on financial grounds; the decision then weighs the same qualitative factors as buying.
Formula
Cost to make = total fixed costs + (variable cost per unit × quantity)
In context
If CTM is lower than the cost to buy (CTB), making is the cheaper option on financial grounds. The decision is not only financial: control of quality and supply, the use of spare capacity, keeping skills in the business and the risks of each option all count. A decision tree (toolkit) can set out the two options and their possible outcomes.
Example
Making the same 2,000 saddles would need $12,000 of new tooling and $11 of materials and labour per saddle, a cost to make of $34,000, so making is $2,000 cheaper than buying.
In management, and in the IB course
General usage
Management accountants count only the costs that change because of the decision, so fixed costs that would be paid anyway are left out.
In the IB course
The guide gives no formula; the usual course method adds the fixed costs of making to the total variable cost, using the figures the question provides.
Common misconceptions
- Misconception
The cost to make is just the cost of the materials.
In factIt includes the fixed costs of making the item, such as tooling and equipment, as well as the variable cost of every unit.
Related terms
Suggested next
- Outsourcing Linked through Cost to buy (CTB) and Insourcing
- Semi-variable cost Linked through Fixed cost