Revision sheet · Unit 5: Operations management

5.6 Production planning

HL only 24 definitions · 10 formulae · 1 framework · 3 exercises
Read the full notes Flashcards for 5.6 (60)

HL This subtopic is HL only. If you are taking SL, it is extension material.

Key points

  • A supply chain turns raw materials into a product in a customer's hands. Local chains are shorter and easier to control; global chains can be cheaper but are slower and more exposed to disruption.
  • Just-in-time holds as little stock as possible and needs reliable, nearby suppliers and quality that is right first time; just-in-case holds buffers against delays and surges, at the cost of cash, space and waste.
  • On a stock control chart, reorder level = buffer stock + (usage × lead time) and maximum stock = buffer stock + reorder quantity: the reorder level says when to order, the reorder quantity how much.
  • Capacity utilization rate = actual output ÷ productive capacity × 100. High utilization spreads fixed costs, but running at 100% leaves no room for maintenance, breakdowns or rush orders.
  • Defect rate = units that fail the quality standard ÷ units made × 100. Defects cost twice, in rework and in reputation.
  • Labour productivity = output ÷ workers or hours; capital productivity = output ÷ capital input; productivity rate = total output ÷ total input × 100.
  • Degree of operating leverage = total contribution ÷ operating profit. High fixed costs magnify the effect of any change in sales on profit.
  • Cost to buy = supplier price × quantity; cost to make = fixed costs + (variable cost × quantity). Making tends to win at high volumes, and quality, control, risk and ethics often decide.
  • The guide gives formulas only for capacity utilization and the productivity rate, so state the standard form for every other measure before substituting.

Common examination mistakes

  1. “Just-in-time means holding no stock at all.”

    Instead: It means holding minimal stock and receiving supplies as needed; most JIT systems still keep small buffers.

    Glossary: Just-in-time (JIT)

  2. “The reorder level is how much stock is ordered each time.”

    Instead: That is the reorder quantity; the reorder level is the point at which to order.

    Glossary: Reorder level

  3. “A business should always aim for 100% capacity utilization.”

    Instead: Running flat out leaves no time for maintenance and no room for an extra order, and can overstretch staff, so many businesses aim for a high rate below full capacity.

    Glossary: Capacity utilization rate

Key definitions

The IB glossary terms of 5.6, in the platform's own words. Terms beyond the course are not included.

Buffer stock
The minimum level of stock a business plans to keep in reserve, so that it can keep producing or selling if a delivery is late or demand is higher than expected.
Capacity utilization rate
A business's actual output in a period as a percentage of its productive capacity, the most it could produce with its existing resources.
Capital productivity
The output produced per unit of capital used, such as per machine, per machine hour or per dollar of equipment.
Capital-intensive production
Production that relies more on machinery, equipment and technology than on people, so that capital is the largest share of its costs.
Cost to buy (CTB)
The total cost of buying a product or component from an outside supplier, instead of making it, for the quantity needed.
Cost to make (CTM)
The total cost of producing a product or component in-house for the quantity needed, made up of the fixed costs and the variable costs of production.
Defect rate
The percentage of units produced that fail to meet the required quality standard.
Just-in-case (JIC)
An approach to stock control that holds large stocks of materials and finished goods as insurance against late deliveries, faults or sudden rises in demand.
Just-in-time (JIT)
A lean method of production and stock control in which materials arrive just as they are needed and goods are made to meet actual orders, so that little or no stock is held.
Labour productivity
The output produced per worker, or per hour of labour, in a period.
Labour-intensive production
Production that relies more on people than on machinery, so that labour is the largest share of its costs.
Lead time
The time between placing an order with a supplier and receiving the goods, ready to use.
Maximum stock level
The highest level that stock is planned to reach, just after a delivery arrives.
Operating leverage
The extent to which a business's costs are fixed rather than variable, which decides how sharply its operating profit changes when its sales change.
Outsourcing
Paying another business to carry out an activity, or to make a product or part, that the business used to do, or could do, itself.
Productive capacity
The maximum output a business can produce in a period with the resources it has now, such as its buildings, equipment and staff.
Productivity rate
A measure of how much output a business gets from the inputs it uses, expressed as total output as a percentage of total input.
Rationalization
Reorganizing a business to cut costs and raise efficiency, often by reducing its capacity through closing sites, selling equipment or cutting staff.
Reorder level
The level of stock at which a new order is placed, set so that the delivery arrives before stock falls below the buffer level.
Reorder quantity
The amount of stock ordered each time a new order is placed.
Spare capacity
The extra output a business could produce with its existing resources, because it is producing less than its productive capacity.
Stock control chart
A graph of the level of stock over time, used to plan when to reorder and how much, showing usage, the reorder level, the lead time, the buffer stock and the reorder quantity.
Stock-out
A situation in which a business runs out of an item of stock, so that it cannot produce or cannot meet its customers' orders.
Supply chain
The linked sequence of organizations and activities that takes a product from raw materials, through production and distribution, to the final customer.

Formulae

Each with what it measures. The formula sheet shows which ones the examination provides.

Formula What it measures
Capacity utilization rate = actual output ÷ productive capacity × 100 A business's actual output in a period as a percentage of its productive capacity, the most it could produce with its existing resources.
Defect rate = units that fail to meet the quality standard ÷ units made × 100 The percentage of units produced that fail to meet the required quality standard.
Reorder level = buffer stock + (usage per period × lead time in periods) The level of stock at which a new order is placed, set so that the delivery arrives before stock falls below the buffer level.
Maximum stock level = buffer stock + reorder quantity The highest level that stock is planned to reach, just after a delivery arrives.
Labour productivity = total output ÷ number of workers (or labour hours) The output produced per worker, or per hour of labour, in a period.
Capital productivity = total output ÷ capital input (such as machine hours) The output produced per unit of capital used, such as per machine, per machine hour or per dollar of equipment.
Productivity rate = total output ÷ total input × 100 A measure of how much output a business gets from the inputs it uses, expressed as total output as a percentage of total input.
Degree of operating leverage = total contribution ÷ operating profit The extent to which a business's costs are fixed rather than variable, which decides how sharply its operating profit changes when its sales change.
Cost to buy = supplier price per unit × quantity The total cost of buying a product or component from an outside supplier, instead of making it, for the quantity needed.
Cost to make = total fixed costs of making + (variable cost per unit × quantity) The total cost of producing a product or component in-house for the quantity needed, made up of the fixed costs and the variable costs of production.

Frameworks and tools

From the frameworks library: what each is for, a situation it suits, and one limitation.

  • Critical path analysis IB toolkit

    Purpose
    To schedule a project, find the activities that need the closest management, and see where resources can be moved without delaying completion.
    Use it when
    Projects with many tasks that depend on each other and a fixed deadline, such as a refit, a product launch or the move to a new site.
    One limitation
    Durations are estimates, and the critical path can change when they are wrong.

Apply it

Short exercises on fictional businesses, written for the platform; none is an IB question. Answer first, then open the outline of what a strong answer does.

  1. Fictional Calculate · AO4

    Brakewell Paints uses 400 tins of base paint a week. Its supplier takes 2 weeks to deliver, it keeps a buffer stock of 300 tins, and it orders 1,600 tins at a time.

    Calculate Brakewell Paints' reorder level and maximum stock level.

    Show a model answer outlineModel answer outline
    • Reorder level = buffer stock + (usage × lead time) = 300 + (400 × 2) = 1,100 tins.
    • Maximum stock level = buffer stock + reorder quantity = 300 + 1,600 = 1,900 tins.
    • Shows the cycle on a stock control chart: from 1,900 tins the stock reaches 1,100 after two weeks, when the order is placed, and 300 two weeks later, when the delivery arrives.
  2. Fictional Recommend · AO3

    Brakewell Paints needs 10,000 metal tins a year. It can buy them at $3.50 each, or make them itself with fixed costs of $12,000 a year and a variable cost of $2.00 a tin.

    Recommend, using the cost to make and the cost to buy, whether Brakewell Paints should make or buy its tins.

    Show a model answer outlineModel answer outline
    • Cost to buy = $3.50 × 10,000 = $35,000; cost to make = $12,000 + ($2.00 × 10,000) = $32,000: making saves $3,000 a year.
    • Notes how small the saving is: if Brakewell needed only 8,000 tins, making would cost $28,000 against $28,000 to buy.
    • Adds the qualitative factors: spare capacity and skills, quality, reliable supply, and focus on making paint.
    • Gives a justified recommendation, such as buying unless volumes are expected to grow.
  3. Fictional Calculate · AO4

    Brakewell Paints' mixing plant could make 5,000 litres of paint a day but makes 3,500. Its 14 mixing workers produce those 3,500 litres.

    Calculate the capacity utilization rate and the labour productivity of the mixing plant, and explain one way to raise each.

    Show a model answer outlineModel answer outline
    • Capacity utilization rate = (3,500 ÷ 5,000) × 100 = 70%.
    • Labour productivity = 3,500 ÷ 14 = 250 litres a worker a day.
    • Raising capacity utilization: win more orders, take on work for other firms, or reduce capacity (rationalization).
    • Raising productivity: training, better equipment or improved methods; explains that spare capacity spreads fixed costs over fewer litres.

Answer from memory

8 recall questions from the 5.6 notes

Answer each question from memory, out loud or on paper, before you reveal the answer. Your ratings also schedule these questions in your flashcards.

  1. Give two advantages and two risks of a global supply chain.

    Advantages, for example lower costs and access to materials or skills found elsewhere. Risks, for example long lead times, disruption from storms, conflict or pandemics, changes in exchange rates or tariffs, and harder checks on suppliers' ethics.

    How well did you recall it?
  2. Why does just-in-time depend on reliable suppliers?

    Because it holds little or no buffer stock, so one late or faulty delivery stops production.

    How well did you recall it?
  3. A business uses 50 units a day, its lead time is 4 days and its buffer stock is 100 units. What is its reorder level?

    100 + (50 × 4) = 300 units.

    How well did you recall it?
  4. What is the difference between the reorder level and the reorder quantity?

    The reorder level is the stock level at which an order is placed (when to order); the reorder quantity is the amount ordered each time (how much).

    How well did you recall it?
  5. A factory can make 12,000 units a month and makes 9,000. What is its capacity utilization rate, and how could it raise it?

    9,000 ÷ 12,000 × 100 = 75%. For example by boosting demand, using the spare capacity to make products for other firms, or rationalizing to cut capacity.

    How well did you recall it?
  6. Of 1,500 units made, 45 fail inspection. What is the defect rate?

    45 ÷ 1,500 × 100 = 3%.

    How well did you recall it?
  7. Total contribution is $90,000 and fixed costs are $60,000. What is the degree of operating leverage, and what does it mean?

    Operating profit is $30,000, so 90,000 ÷ 30,000 = 3. A 1% change in sales changes operating profit by 3%.

    How well did you recall it?
  8. Give two reasons why a business might make a component even though its cost to make is above its cost to buy.

    For example control over quality and supply, protecting its know-how, using spare capacity, or avoiding dependence on a single supplier or on suppliers with poor ethical standards.