Mindmap · 5.3 · Unit 5: Operations management

Lean production and quality management

How lean production cuts waste, how kaizen, just-in-time and cradle to cradle design work, and how businesses control, assure and manage quality.

Read the topic: 5.3 Lean production and quality management HL only · 39 ideas in 7 branches

Mindmap: Lean production and quality managementHow lean production cuts waste, how kaizen, just-in-time and cradle to cradle design work, and how businesses control, assure and manage quality. The same content follows as an outline.5.3Lean productionand qualitymanagementLean production=Cut whatever adds no valueFeature: less wasteOverproduction, excess stockWaiting and needless movementDefects and over-processingFeature: greater efficiencyLean methods=Kaizen: continuousimprovement=Just-in-time (JIT)+Frees cash and space−Needs reliable suppliersCradle to cradle=Every material reused orsafely returnedDesigned for repair anddisassemblyTwo material cyclesNot make, use, throw awayControlling quality=Quality control: inspect=Quality assurance: preventDefect rate shows the resultManaging qualityQuality circlesBenchmarkingTotal quality managementQuality standards=Set requirements, certifiedNational: set by a countryInternational: e.g. ISO 9000Why they matter+Trust and access to contracts−Costly; proves process onlyImpact on theorganization+Lower costs and less waste+Better quality andreputation+Involved, motivated staff−Training and culture costs−JIT exposed to supply shocks−Benefits can take years

Drag to move the map, or use the arrow keys. Click a branch to fold it away. Whole map shows all of it; zoom with the buttons, or with Ctrl and the scroll wheel.

  • Core ideas
  • Tools
  • Types and forms
  • Evaluation
  • Advantage
  • Limitation
  • HL HL only
The map as an outline

Lean production HL

Core ideas

Lean methods HL

Tools
  • Definition Kaizen: continuous improvement Many small changes suggested by the people who do the work.
  • Definition Just-in-time (JIT) Materials arrive as needed; goods are made to order.
    • Advantage Frees cash and space
    • Limitation Needs reliable suppliers

Cradle to cradle HL

Core ideas
  • Definition Every material reused or safely returned
  • Designed for repair and disassembly
  • Two material cycles Biological materials break down safely; technical materials are recovered and reused.
  • Not make, use, throw away A route to a circular business model (toolkit).

Controlling quality HL

Types and forms

Managing quality HL

Tools

Quality standards HL

Core ideas
  • Definition Set requirements, certified
  • National: set by a country
  • International: e.g. ISO 9000 Recognized across borders, which helps exporters.
  • Why they matter
    • Advantage Trust and access to contracts
    • Limitation Costly; proves process only

Impact on the organization HL

Evaluation
  • Advantage Lower costs and less waste
  • Advantage Better quality and reputation
  • Advantage Involved, motivated staff Kaizen and quality circles use employees' ideas.
  • Limitation Training and culture costs
  • Limitation JIT exposed to supply shocks
  • Limitation Benefits can take years

Section 01: Key terms

Each opens its glossary entry: definition, context, example and related terms.

Where this part of the course meets the rest.

Checked against: Business management guide, first assessment 2024 (published February 2022, updated May 2022), p. 34. The map is the platform's own summary; the IB guide is the authority on the course.