Operations Enrichment: beyond the IB course
Bottleneck
Also called Constraint
Where you meet this term: Secondary schoolUndergraduateProfessional
The stage of a process with the lowest capacity, which limits the output of the whole process.
In plain words
The slowest step in a process. However fast the other steps are, the whole process can only go as fast as this one.
In more depth
Output is set by the bottleneck, so an hour lost there is an hour lost for the whole system, while an hour saved elsewhere saves nothing. Bottlenecks show up as queues in front of them and idle time after them. Improvement starts by finding and fully using the bottleneck, then adding to its capacity, after which the constraint moves somewhere else, which is the logic of the theory of constraints.
Example
A fictional sandwich shop can make 120 sandwiches an hour, but its one till serves 60 customers an hour, so at lunchtime the till, not the kitchen, limits its sales.
Common misconceptions
- Misconception
Speeding up any step speeds up the whole process.
In factOnly improving the bottleneck raises output; faster steps elsewhere just build bigger queues.
Related terms
Suggested next
- Lean production Linked through Theory of constraints (TOC) and Takt time
- Spare capacity Linked through Productive capacity and Capacity utilization rate
- Just-in-time (JIT) Linked through Takt time
- Kaizen Linked through Theory of constraints (TOC)
- Outsourcing Linked through Productive capacity
- Rationalization Linked through Productive capacity