Revision sheet · Unit 5: Operations management

5.1 Introduction to operations management

SL and HL 9 definitions · 4 formulae · 3 frameworks · 3 exercises
Read the full notes Flashcards for 5.1 (38)
Show content for

Showing everything. HL-only material is marked HL.

Key points

  • Operations management plans, runs and improves the processes that turn inputs into goods and services.
  • Inputs, the factors of production, are transformed into outputs; operations should add value, and it must also manage unwanted outputs such as waste.
  • Goods can be stored and checked before sale; services are usually produced as they are consumed, often with the customer present.
  • Operations aims for low cost, quality, speed, dependability and flexibility, and increasingly sustainability. The objectives conflict, so each business chooses which matter most.
  • Unit cost = total costs ÷ output. It falls as fixed costs are spread over more output and as waste is cut.
  • Operations makes long-term decisions (method, capacity, location, make or buy) and daily ones (scheduling, quality, stock).
  • Operations depends on marketing, finance and human resources, and a change in operations affects them all.
  • Sustainable and ethical operations, including circular business models, can cut costs and protect reputation, though some choices cost more.
  • Measure each objective, for example with an on-time delivery rate, a waste rate and unit cost; compare the results with targets, past periods or rivals; and look at the spread as well as the average.
  • A creative production process can disrupt a market, as a new way of making, delivering or serving lets a business offer what its rivals cannot easily match.

Common examination mistakes

  1. “Added value is the same as profit.”

    Instead: Added value is the price minus the cost of bought-in materials and services; labour, overheads and the owners' return must come out of it before any profit is left.

    Glossary: Added value

  2. “High quality means expensive or luxurious.”

    Instead: Quality means meeting customers' needs and expectations consistently; a cheap product can be high quality for what it promises.

    Glossary: Quality

  3. “Average cost and marginal cost are the same.”

    Instead: Average cost is total cost divided by all units; marginal cost, beyond the course, is the extra cost of one more unit. When fixed costs are large they differ greatly.

    Glossary: Average cost

  4. Taking the longest single activity to be the critical path. HL

    Instead: Add the durations along each route through the network; the critical path is the longest route, not the longest task.

    Critical path analysis

  5. Drawing bars without showing which tasks depend on which. HL

    Instead: Mark the dependencies, so that the effect of a delay can be traced.

    Gantt charts

Key definitions

The IB glossary terms of 5.1, in the platform's own words. Terms beyond the course are not included.

Added value
The difference between the price a business receives for its output and the cost of the materials and services it bought in to make it.
Average cost
Total cost divided by the number of units produced.
Circular business models
Ways of organizing a business so that products and materials stay in use for as long as possible and waste is designed out, instead of following a take, make, use and throw away pattern.
Effectiveness
Producing the right output: goods and services that meet customers' needs and help the organization reach its objectives.
Efficiency
Producing a given output with as few resources as possible, or getting as much output as possible from the resources used.
Goods and services
The two kinds of output a business provides. Goods are physical products that can be stored and owned, such as shoes; services are intangible activities carried out for a customer, such as a haircut.
Operations management
The business function that designs, runs and improves the processes that turn inputs, such as materials, labour, equipment and information, into the goods and services a business sells.
Quality
How well a good or service meets the needs and expectations of its customers, consistently, every time it is supplied.
Transformation process
The sequence of activities through which a business changes its inputs, the factors of production, into outputs of goods and services that customers value more highly than the inputs themselves.

Formulae

Each with what it measures. The formula sheet shows which ones the examination provides.

Formula What it measures
Added value = selling price − cost of bought-in materials and services The difference between the price a business receives for its output and the cost of the materials and services it bought in to make it.
Unit cost = total costs ÷ output Total cost divided by the number of units produced.
On-time delivery rate = deliveries made on time ÷ total deliveries × 100 The share of deliveries that arrived when promised: a measure of how dependable an operation is for its customers.
Waste rate = units wasted ÷ units produced × 100 The share of output that was wasted: a measure of efficiency, and of part of the operation's environmental cost.

Frameworks and tools

From the frameworks library: what each is for, a situation it suits, and one limitation.

  • Critical path analysis IB toolkit HL

    Purpose
    To schedule a project, find the activities that need the closest management, and see where resources can be moved without delaying completion.
    Use it when
    Projects with many tasks that depend on each other and a fixed deadline, such as a refit, a product launch or the move to a new site.
    One limitation
    Durations are estimates, and the critical path can change when they are wrong.
  • Gantt charts IB toolkit HL

    Purpose
    To plan and track a project's timing, allocate people to tasks and communicate the schedule.
    Use it when
    Communicating a project's timetable to a team, a client or a board who need to see at a glance what happens when.
    One limitation
    Dependencies are harder to read than on a network diagram, especially in large projects.
  • The value chain Enrichment

    Purpose
    To find the sources of a business's cost position and its differentiation, so that managers know which activities to protect and invest in, which to improve, and which another firm could do better and more cheaply.
    Use it when
    Finding the source of a business's advantage, such as a coffee roaster whose edge lies in its sourcing and its training of café staff.
    One limitation
    It was designed around manufacturing; service, platform and digital businesses fit its categories less neatly.

Apply it

Short exercises on fictional businesses, written for the platform; none is an IB question. Answer first, then open the outline of what a strong answer does.

  1. Fictional Explain · AO2

    Quernstone Bakery turns flour, butter and fruit into bread and cakes, which it sells in its own café and to local shops.

    Explain the role of operations management at Quernstone Bakery.

    Show a model answer outlineModel answer outline
    • Operations management plans and controls the transformation process: inputs such as ingredients, staff and ovens turned into bread and cakes.
    • It aims to do so efficiently, at low cost and waste, and effectively, with the products, quality and timing customers want.
    • It works with the other functions: marketing on what to make, finance on costs and investment, human resources on staff and skills.
    • Applies each point to the bakery, such as baking enough for the shops' morning deliveries.
  2. Fictional Distinguish · AO2

    Quernstone Bakery cut its costs and waste by baking in larger batches, but its bread is now often a day old when it reaches the café.

    Distinguish between efficiency and effectiveness, using Quernstone Bakery.

    Show a model answer outlineModel answer outline
    • Efficiency is producing an output with as few resources as possible: larger batches lowered the cost of each loaf.
    • Effectiveness is producing the right output, one that meets customers' needs: fresh bread for the café.
    • Shows the trade-off in the case: Quernstone Bakery became more efficient and less effective, and operations must aim for both.
  3. Fictional Explain · AO2

    Customers have asked Quernstone Bakery to cut its food waste and its use of plastic packaging.

    Explain two ways Quernstone Bakery's operations could become more sustainable.

    Show a model answer outlineModel answer outline
    • Cut waste by baking to forecasts and orders, and selling or donating unsold bread at the end of the day.
    • Switch to reusable or compostable packaging, or let regular customers bring their own bags.
    • Others: energy-efficient ovens, or local suppliers to cut transport.
    • Explains each change's cost and benefit, including whether customers will value it.

Answer from memory

14 recall questions from the 5.1 notes

Answer each question from memory, out loud or on paper, before you reveal the answer. Your ratings also schedule these questions in your flashcards.

  1. What is operations management?

    The business function that plans, runs and improves the processes that turn inputs into the goods and services a business sells.

    How well did you recall it?
  2. Name the three stages of the transformation process, with an example of each for a bakery.

    Inputs, such as flour, bakers and ovens; the process, mixing, proving and baking; and outputs, loaves sold to customers (and waste, which must be managed too).

    How well did you recall it?
  3. Give two differences between operations for goods and for services.

    For example, goods can be stored and services usually cannot; goods can be checked before the customer sees them, while services are experienced as they are produced; services often involve the customer directly and vary more from one occasion to the next.

    How well did you recall it?
  4. Name the five operations objectives that textbooks commonly describe.

    Cost, quality, speed, dependability and flexibility, with sustainability increasingly added as a sixth.

    How well did you recall it?
  5. Why can an operation not be the best at all of its objectives at once?

    They conflict. Flexibility and speed usually raise cost, and checking every item for quality slows production, so a business must choose which objectives matter most to its customers.

    How well did you recall it?
  6. Fixed costs are $2,000 a day, the variable cost is $3 a unit, and output is 500 units. What is the unit cost?

    ($2,000 + 500 × $3) ÷ 500 = $3,500 ÷ 500 = $7, which is $4 of fixed costs plus $3 of variable cost a unit.

    How well did you recall it?
  7. What is the difference between efficiency and effectiveness?

    Efficiency is producing with as few resources as possible; effectiveness is producing the right output, one that meets customers' needs.

    How well did you recall it?
  8. Give one way operations depends on marketing, and one way marketing depends on operations.

    Operations depends on marketing's forecasts to know how much to make; marketing depends on operations to keep the promises it makes, such as quality and delivery times.

    How well did you recall it?
  9. Name the five circular business models in the toolkit.

    Circular supply, resource recovery, product life extension, sharing, and product service system models.

    How well did you recall it?
  10. Why can sustainable operations lower costs?

    Using less energy and fewer materials, wasting less and keeping products in use for longer all save money as well as reducing harm to the environment.

    How well did you recall it?
  11. (HL) Ovens can bake 3,000 loaves a day and bake 2,400. What is the capacity utilization rate?

    2,400 ÷ 3,000 × 100 = 80%.

    How well did you recall it?
  12. How is an on-time delivery rate calculated?

    Deliveries made on time ÷ total deliveries × 100.

    How well did you recall it?
  13. Late deliveries on five days were 1, 2, 2, 3 and 12. Give the mean and the median, and say which better describes a typical day.

    The mean is 20 ÷ 5 = 4 and the median is 2. The median better describes a typical day, because the one bad day pulls the mean up.

    How well did you recall it?
  14. What does it mean for a creative production process to disrupt a market?

    A new way of making, delivering or serving lets a business offer something rivals cannot easily match, such as much lower prices or faster delivery, and established firms built for the old process struggle to follow.

    How well did you recall it?

Reveal and rate each card.

Arjun Agrawal | The Business Brief. Gathered from the platform's notes, glossary, calculation register and frameworks library. Original teaching material; not an IB publication.