People and Culture: Builder

Organization chart creator

An organization chart is a model of who reports to whom. Build one post by post, or start from the worked example, and the tool counts the levels of the hierarchy, measures every span of control, traces any chain of command, shows what removing a layer of management would change and names the kind of structure the chart resembles.

Back to 2.2 Organizational structure

Status
SL and HLAO2, AO4
Worked example
Marrick Cycles, a fictional bicycle maker

Section 01: How to use it

  1. Start from the worked example, or replace it. Give each post a title, the number of people who hold it and the post it reports to. Identical jobs under one manager are one post held by several people.

  2. For each department directly under the top post, say whether it is grouped by function, by product or by region.

  3. Read the figures, the structure the chart resembles and the spans at each level. Choose any post to trace its chain of command to the top.

  4. Remove a layer of management and compare the chart before and after. Your chart is kept on this device; download it as JSON or CSV, open a saved file, or print it.

Where it sits in the course. Subtopic 2.2, Organizational structure (guide, p. 25), for SL and HL. The guide asks for the terms of structure, including span of control, levels of the hierarchy, chain of command and delayering (AO2), for organization charts that are flat, tall, or organized by function, product or region (AO2 and AO4, so you may be asked to construct one), and for judging which structure suits a change in external factors (AO3). The HL statement on project-based organization and the Shamrock Organization is not modelled here.

Builder

Marrick Cycles, a fictional bicycle maker

Source: Simulated data SL and HL

Marrick Cycles employs 27 people. Its chart is the one described in the notes on organizational structure: the owner manages production, sales and finance, and two supervisors each run eight assemblers. The comparison removes the supervisors. Every figure is simulated.

Your changes are kept in this browser, on this device only.

The chart

The managers at that level go; their staff report to the next manager up.

Chain of command Assembler, team A → Supervisor, team A → Production manager → Owner: 4 posts, 3 steps from the bottom to the top.

Organization chart: Marrick CyclesOrganization chart of Marrick Cycles: 10 posts, 27 people, 4 levels of hierarchy. A functional structure, between tall and flat. Level 1: Owner (span of control 3). Level 2: Production manager (span of control 2), reporting to Owner; Sales manager (span of control 3), reporting to Owner; Finance manager (span of control 2), reporting to Owner. Level 3: Supervisor, team A (span of control 8), reporting to Production manager; Supervisor, team B (span of control 8), reporting to Production manager; Sales adviser (3 people), reporting to Sales manager; Finance clerk (2 people), reporting to Finance manager. Level 4: Assembler, team A (8 people), reporting to Supervisor, team A; Assembler, team B (8 people), reporting to Supervisor, team B. Highlighted: the chain of command from Assembler, team A to Owner. Marked as removed by delayering: Supervisor, team A, Supervisor, team B.Level 1Level 2Level 3Level 4OwnerSpan of control 3Production managerSpan of control 2Supervisor, team ARemoved by delayeringAssembler, team A8 peopleSupervisor, team BRemoved by delayeringAssembler, team B8 peopleSales managerSpan of control 3Sales adviser3 peopleFinance managerSpan of control 2Finance clerk2 people
Chart One row per level. A box with a coloured top edge is a manager, shown with its span of control; a stacked box is a post held by several people. The chain of command is drawn in blue; posts removed by delayering are dashed and labelled. Simulated teaching data.

The posts

Each post reports to one manager. Identical jobs under one manager are one post, with the number of people who hold it.

  1. OwnerLevel 1

  2. Production managerLevel 2

  3. Supervisor, team ALevel 3

  4. Assembler, team ALevel 4

  5. Supervisor, team BLevel 3

  6. Assembler, team BLevel 4

  7. Sales managerLevel 2

  8. Sales adviserLevel 3

  9. Finance managerLevel 2

  10. Finance clerkLevel 3

This is the worked example. With JavaScript on, you can change the posts, and the chart, figures and readings follow.

What the chart shows

Levels of hierarchy
4
People
27in 10 posts
Managers
6posts with someone reporting to them
Average span of control
4.3direct reports per manager
Widest span of control
8Supervisor, team A
Longest chain of command
4 postsAssembler, team A to Owner
Shape
between tall and flatthe platform’s rule of thumb
Departments
grouped by functionthe posts directly under the top

The structure it resembles

A functional structure, between tall and flat

  • It has 4 levels of hierarchy for 27 people, and each manager has 4.3 direct reports on average.
  • Neither clearly tall nor flat: compare it with the chart after delayering, or with another business of its size.
  • The departments under the top post are functions, such as production, sales and finance, so specialists work together.

Reading. Removing level 3 takes out 2 posts (2 people): the chart goes from 4 to 3 levels, and the average span of control from 4.3 to 6. Production manager's span rises from 2 to 16. The longest chain of command falls from 4 to 3 posts.

Implication. Decisions reach the front line faster and salaries are saved, but a span of 16 is very wide: the managers left behind need staff who can work with little supervision, or the change brings overload rather than freedom.

Level by level

Span of control at each level

Level Posts People Managers Spans of control Average span
Level 111133
Level 23332, 3, 22.3
Level 34728, 88
Level 42160nonen/a

The chart as a list

  • Owner level 1, 1 person, span of control 3
    • Production manager level 2, 1 person, span of control 2
      • Supervisor, team A level 3, 1 person, span of control 8
        • Assembler, team A level 4, 8 people
      • Supervisor, team B level 3, 1 person, span of control 8
        • Assembler, team B level 4, 8 people
    • Sales manager level 2, 1 person, span of control 3
      • Sales adviser level 3, 3 people
    • Finance manager level 2, 1 person, span of control 2
      • Finance clerk level 3, 2 people

Delayering: removing level 3

The worked example compares the chart with and without its level 3 managers.

Measure Now After delayering
Levels of hierarchy43
Posts108
People2725
Managers64
Average span of control4.36
Widest span of control8 (Supervisor, team A)16 (Production manager)
Longest chain of command, in posts43
Shapebetween tall and flatflat (horizontal)
The chart after delayering
Organization chart: Marrick Cycles after delayeringOrganization chart of Marrick Cycles after delayering: 8 posts, 25 people, 3 levels of hierarchy. A flat, functional structure. Level 1: Owner (span of control 3). Level 2: Production manager (span of control 16), reporting to Owner; Sales manager (span of control 3), reporting to Owner; Finance manager (span of control 2), reporting to Owner. Level 3: Assembler, team A (8 people), reporting to Production manager; Assembler, team B (8 people), reporting to Production manager; Sales adviser (3 people), reporting to Sales manager; Finance clerk (2 people), reporting to Finance manager.Level 1Level 2Level 3OwnerSpan of control 3Production managerSpan of control 16Assembler, team A8 peopleAssembler, team B8 peopleSales managerSpan of control 3Sales adviser3 peopleFinance managerSpan of control 2Finance clerk2 people

Section 02: What it leaves out

Every model simplifies. Say so in an answer, and say what else you would want to know.

  • A chart shows formal reporting lines only. Informal networks, and where decisions are really made, can look quite different, so it cannot tell you how centralized or how bureaucratic an organization is.
  • Every post here has one manager, so the tool cannot draw a matrix structure, in which people report to a functional manager and a project manager at once.
  • Tall, flat and between are the platform's rule of thumb, not an IB definition: flat means two levels, or three or fewer with five or more direct reports per manager; tall means five or more levels, or fewer than three direct reports per manager. The terms are relative, so compare charts rather than label one alone.
  • Spans of control count people, not workload. Eight assemblers doing one routine task are easier to supervise than eight specialists, and the numbers cannot show the difference.
  • Delayering here removes every manager at one level and moves their staff up a line. A real restructuring also changes jobs, pay, morale and the knowledge that leaves with the managers.

Section 03: Read and practise next