An organization chart is a model of who reports to whom. Build one post by post, or start from the worked example, and the tool counts the levels of the hierarchy, measures every span of control, traces any chain of command, shows what removing a layer of management would change and names the kind of structure the chart resembles.
Section 01: How to use it
-
Start from the worked example, or replace it. Give each post a title, the number of people who hold it and the post it reports to. Identical jobs under one manager are one post held by several people.
-
For each department directly under the top post, say whether it is grouped by function, by product or by region.
-
Read the figures, the structure the chart resembles and the spans at each level. Choose any post to trace its chain of command to the top.
-
Remove a layer of management and compare the chart before and after. Your chart is kept on this device; download it as JSON or CSV, open a saved file, or print it.
Where it sits in the course. Subtopic 2.2, Organizational structure (guide, p. 25), for SL and HL. The guide asks for the terms of structure, including span of control, levels of the hierarchy, chain of command and delayering (AO2), for organization charts that are flat, tall, or organized by function, product or region (AO2 and AO4, so you may be asked to construct one), and for judging which structure suits a change in external factors (AO3). The HL statement on project-based organization and the Shamrock Organization is not modelled here.
Builder
Marrick Cycles, a fictional bicycle maker
Marrick Cycles employs 27 people. Its chart is the one described in the notes on organizational structure: the owner manages production, sales and finance, and two supervisors each run eight assemblers. The comparison removes the supervisors. Every figure is simulated.
The tool could not start in this browser. Everything below is the worked example as it was prepared, with its results.
The chart
Chain of command Assembler, team A → Supervisor, team A → Production manager → Owner: 4 posts, 3 steps from the bottom to the top.
What the chart shows
- Levels of hierarchy
- 4
- People
- 27in 10 posts
- Managers
- 6posts with someone reporting to them
- Average span of control
- 4.3direct reports per manager
- Widest span of control
- 8Supervisor, team A
- Longest chain of command
- 4 postsAssembler, team A to Owner
- Shape
- between tall and flatthe platform’s rule of thumb
- Departments
- grouped by functionthe posts directly under the top
The structure it resembles
A functional structure, between tall and flat
- It has 4 levels of hierarchy for 27 people, and each manager has 4.3 direct reports on average.
- Neither clearly tall nor flat: compare it with the chart after delayering, or with another business of its size.
- The departments under the top post are functions, such as production, sales and finance, so specialists work together.
Reading. Removing level 3 takes out 2 posts (2 people): the chart goes from 4 to 3 levels, and the average span of control from 4.3 to 6. Production manager's span rises from 2 to 16. The longest chain of command falls from 4 to 3 posts.
Implication. Decisions reach the front line faster and salaries are saved, but a span of 16 is very wide: the managers left behind need staff who can work with little supervision, or the change brings overload rather than freedom.
Level by level
Span of control at each level
| Level | Posts | People | Managers | Spans of control | Average span |
|---|---|---|---|---|---|
| Level 1 | 1 | 1 | 1 | 3 | 3 |
| Level 2 | 3 | 3 | 3 | 2, 3, 2 | 2.3 |
| Level 3 | 4 | 7 | 2 | 8, 8 | 8 |
| Level 4 | 2 | 16 | 0 | none | n/a |
The chart as a list
- Owner
- Production manager
- Supervisor, team A
- Assembler, team A
- Supervisor, team B
- Assembler, team B
- Supervisor, team A
- Sales manager
- Sales adviser
- Finance manager
- Finance clerk
- Production manager
Delayering: removing level 3
The worked example compares the chart with and without its level 3 managers.
| Measure | Now | After delayering |
|---|---|---|
| Levels of hierarchy | 4 | 3 |
| Posts | 10 | 8 |
| People | 27 | 25 |
| Managers | 6 | 4 |
| Average span of control | 4.3 | 6 |
| Widest span of control | 8 (Supervisor, team A) | 16 (Production manager) |
| Longest chain of command, in posts | 4 | 3 |
| Shape | between tall and flat | flat (horizontal) |
The chart after delayering
Section 02: What it leaves out
Every model simplifies. Say so in an answer, and say what else you would want to know.
- A chart shows formal reporting lines only. Informal networks, and where decisions are really made, can look quite different, so it cannot tell you how centralized or how bureaucratic an organization is.
- Every post here has one manager, so the tool cannot draw a matrix structure, in which people report to a functional manager and a project manager at once.
- Tall, flat and between are the platform's rule of thumb, not an IB definition: flat means two levels, or three or fewer with five or more direct reports per manager; tall means five or more levels, or fewer than three direct reports per manager. The terms are relative, so compare charts rather than label one alone.
- Spans of control count people, not workload. Eight assemblers doing one routine task are easier to supervise than eight specialists, and the numbers cannot show the difference.
- Delayering here removes every manager at one level and moves their staff up a line. A real restructuring also changes jobs, pay, morale and the knowledge that leaves with the managers.
Section 03: Read and practise next