Toolkit and decision tool Enrichment: beyond the IB course
Value stream mapping
Also called VSM
Where you meet this term: UndergraduateProfessional
A lean method of drawing every step, flow of material and flow of information needed to deliver a product to the customer, with the time taken at each step, to find waste and plan a better future state.
In plain words
Drawing a map of everything that happens from an order to the delivery, with how long each step takes, to see where time and effort are wasted.
In more depth
The current-state map records the process steps, the stock between them, cycle and waiting times and the flows of information, and it often reveals that the time spent adding value is a small fraction of the total lead time. A future-state map then designs flow, pull and a pace matched to takt time. It differs from the value chain, which is a strategic view of a firm's activities.
Example
A fictional kitchen manufacturer's map shows that an order takes 21 days from receipt to delivery, but only 6 hours of that is work on the kitchen; most of the rest is waiting between departments.
Common misconceptions
- Misconception
Value stream mapping is the same as value chain analysis.
In factThe value chain is a strategic view of a firm's activities; value stream mapping is a detailed operational map of one product's flow, used to remove waste.
Related terms
Suggested next
- Just-in-time (JIT) Linked through Lean production and Waste (in lean production) and Takt time
- Efficiency Linked through Lean production and Waste (in lean production)
- Total quality management (TQM) Linked through Lean production and Kaizen
- Expected value A related name
- Stock control chart Linked through Lead time
- Bottleneck Beyond IB Linked through Takt time