Operations

Changeover time

Where you meet this term: IB Diploma

The time taken to switch equipment or a production line from making one product or batch to making another, during which nothing is produced.

In plain words

The time a machine or production line stands idle while it is switched from one product to the next.

In more depth

Every changeover is downtime that uses up capacity and raises the cost of each unit. Shortening changeovers, for example by preparing tools in advance and standardizing parts, lets a business make smaller batches, hold less stock and respond faster to orders.

In context

Changeover time is a cost of batch production: the longer it is, the larger each batch must be to keep machines busy, which adds stock and reduces flexibility. Lean production (HL) sets out to cut changeover times, so that smaller batches, and mass customization, become affordable.

Example

A fictional juice bottler needs 90 minutes to clean its line between orange and apple juice, so it bottles each flavour in long runs.

Common misconceptions

  • Misconception

    A changeover costs nothing because no materials are used.

    In fact

    Equipment and workers stand idle during a changeover, so it uses up capacity that could have made output, and that cost falls on every unit.

Suggested next