Switch between before and after to see which steps lean production shortens.
Show the process Before lean production After lean production
Before lean production
Making a table to order, before lean production. Bars for each step in making a table to order, before or after lean production, showing which steps add value and which are waiting, moving, checking or storing. Fernvale Furniture, a fictional workshop, makes a table to order, before lean production. Order waits to be scheduled: 16 hours, waiting. Wait for timber from the store: 8 hours, waiting. Cut the parts: 2 hours, adds value. Carry parts to the joinery shop: 3 hours, moving. Queue for the joiners: 12 hours, waiting. Join and assemble: 4 hours, adds value. Inspect and rework faults: 5 hours, checking and rework. Finish and varnish: 3 hours, adds value. Store until dispatch: 20 hours, storing. Lead time 73 hours; value added 9 hours (12%); waste 64 hours. Order waits to be scheduled 16 h, waiting Wait for timber from the store 8 h, waiting Cut the parts 2 h, adds value Carry parts to the joinery shop 3 h, moving Queue for the joiners 12 h, waiting Join and assemble 4 h, adds value Inspect and rework faults 5 h, checking and rework Finish and varnish 3 h, adds value Store until dispatch 20 h, storing Lead time 73 hours; value added 9 hours (12%); waste 64 hours. Fernvale Furniture is fictional. Making a table to order, before lean production. Bars for each step in making a table to order, before or after lean production, showing which steps add value and which are waiting, moving, checking or storing. Fernvale Furniture, a fictional workshop, makes a table to order, before lean production. Order waits to be scheduled: 16 hours, waiting. Wait for timber from the store: 8 hours, waiting. Cut the parts: 2 hours, adds value. Carry parts to the joinery shop: 3 hours, moving. Queue for the joiners: 12 hours, waiting. Join and assemble: 4 hours, adds value. Inspect and rework faults: 5 hours, checking and rework. Finish and varnish: 3 hours, adds value. Store until dispatch: 20 hours, storing. Lead time 73 hours; value added 9 hours (12%); waste 64 hours. Order waits to be scheduled 16 h, waiting Wait for timber from the store 8 h, waiting Cut the parts 2 h, adds value Carry parts to the joinery shop 3 h, moving Queue for the joiners 12 h, waiting Join and assemble 4 h, adds value Inspect and rework faults 5 h, checking and rework Finish and varnish 3 h, adds value Store until dispatch 20 h, storing Lead time 73 hours; value added 9 hours (12%); waste 64 hours. Fernvale Furniture is fictional. 9 of 73 hours add value: the rest is waste.
After lean production
Making a table to order, after lean production. Bars for each step in making a table to order, before or after lean production, showing which steps add value and which are waiting, moving, checking or storing. Fernvale Furniture, a fictional workshop, makes a table to order, after lean production. Order waits to be scheduled: 2 hours, waiting. Orders are scheduled the day they arrive.. Wait for timber from the store: 0 hours, waiting. Just-in-time: cut timber arrives when the job starts.. Cut the parts: 2 hours, adds value. Carry parts to the joinery shop: 0.5 hours, moving. Kaizen: the saw was moved beside the joiners’ benches.. Queue for the joiners: 2 hours, waiting. Work is released at the pace the joiners can take it.. Join and assemble: 4 hours, adds value. Inspect and rework faults: 1 hours, checking and rework. Quality assurance: each person checks their own stage, so faults are not built in.. Finish and varnish: 3 hours, adds value. Store until dispatch: 2 hours, storing. Just-in-time: tables are made to a delivery date and leave when finished.. Lead time 16.5 hours; value added 9 hours (55%); waste 7.5 hours. Order waits to be scheduled 2 h, waiting Orders are scheduled the day they arrive. Wait for timber from the store 0 h, waiting Just-in-time: cut timber arrives when the job starts. Cut the parts 2 h, adds value Carry parts to the joinery shop 0.5 h, moving Kaizen: the saw was moved beside the joiners’ benches. Queue for the joiners 2 h, waiting Work is released at the pace the joiners can take it. Join and assemble 4 h, adds value Inspect and rework faults 1 h, checking and rework Quality assurance: each person checks their own stage, so faults are not built in. Finish and varnish 3 h, adds value Store until dispatch 2 h, storing Just-in-time: tables are made to a delivery date and leave when finished. Lead time 16.5 hours; value added 9 hours (55%); waste 7.5 hours. Fernvale Furniture is fictional. Making a table to order, after lean production. Bars for each step in making a table to order, before or after lean production, showing which steps add value and which are waiting, moving, checking or storing. Fernvale Furniture, a fictional workshop, makes a table to order, after lean production. Order waits to be scheduled: 2 hours, waiting. Orders are scheduled the day they arrive.. Wait for timber from the store: 0 hours, waiting. Just-in-time: cut timber arrives when the job starts.. Cut the parts: 2 hours, adds value. Carry parts to the joinery shop: 0.5 hours, moving. Kaizen: the saw was moved beside the joiners’ benches.. Queue for the joiners: 2 hours, waiting. Work is released at the pace the joiners can take it.. Join and assemble: 4 hours, adds value. Inspect and rework faults: 1 hours, checking and rework. Quality assurance: each person checks their own stage, so faults are not built in.. Finish and varnish: 3 hours, adds value. Store until dispatch: 2 hours, storing. Just-in-time: tables are made to a delivery date and leave when finished.. Lead time 16.5 hours; value added 9 hours (55%); waste 7.5 hours. Order waits to be scheduled 2 h, waiting Orders are scheduled the day they arrive. Wait for timber from the store 0 h, waiting Just-in-time: cut timber arrives when the job starts. Cut the parts 2 h, adds value Carry parts to the joinery shop 0.5 h, moving Kaizen: the saw was moved beside the joiners’ benches. Queue for the joiners 2 h, waiting Work is released at the pace the joiners can take it. Join and assemble 4 h, adds value Inspect and rework faults 1 h, checking and rework Quality assurance: each person checks their own stage, so faults are not built in. Finish and varnish 3 h, adds value Store until dispatch 2 h, storing Just-in-time: tables are made to a delivery date and leave when finished. Lead time 16.5 hours; value added 9 hours (55%); waste 7.5 hours. Fernvale Furniture is fictional. The same 9 hours of work, but the order now takes 16.5 hours instead of 73.
A process before and after lean production HL Making one table to order: lean production cuts the waiting, moving, checking and storing, not the work. Text description Fernvale Furniture, a fictional workshop, makes a table to order. Before lean production the order takes 73 hours, of which 9 add value (12%). After just-in-time deliveries, kaizen changes to the layout, quality assurance at each stage and making to a delivery date, it takes 16.5 hours, of which the same 9 add value (55%). Lean production cuts waste, the time that adds nothing a customer would pay for, not the work itself.
Download SVG
Print